Welcome to our blog documenting the construction of two new houses in Asylum Road, Peckham. The design of the scheme can be seen on our website.

These have been named the Laundry Houses. During the design phases of the project, we found that there had been a laundry on the site of Albert Way, the road that the new houses will open onto. The laundry theme has informed the material and design decisions we have been making.

Over the coming months we will be posting photographs of the construction process and images of things that have influenced and informed the design.

Come back regularly to follow our progress, or visit www.quay2c.com to find out more about us and our work.

Thursday, 26 September 2013

The back half of the houses and lightwells completed. Infill planting boxes will be built later on stepping up to the side of the stairs that are to be lined in recycled plastic decking material.

The completed wall to no 18 Asylum Rd side


Chris and Seb prepare for the last bit of basement wall to be cast

Wednesday, 18 September 2013

On Monday Photographer Anthony Coleman came to site and took these pictures of progress. All is looking good to have the basement complete to receive the solid timber super structure in October

Back view with stairs to garden in place

General site view

General site view

Thursday, 12 September 2013

Stairs in place from the bedroom courtyard up to the back garden. These will have recycled plastic decking on them with raised planter beds to the side.

Precast stair being lifted into position at the back of the site

the precast concrete stairs for the entry up to the garden at the back being delivered. 

The repeat trench box process has been going well over the past couple of weeks. the no 14 side is now complete but filled in to get the digger around. this is a view along the boundary retaining wall to no 18  with the drainage runs now in.