Welcome to our blog documenting the construction of two new houses in Asylum Road, Peckham. The design of the scheme can be seen on our website.

These have been named the Laundry Houses. During the design phases of the project, we found that there had been a laundry on the site of Albert Way, the road that the new houses will open onto. The laundry theme has informed the material and design decisions we have been making.

Over the coming months we will be posting photographs of the construction process and images of things that have influenced and informed the design.

Come back regularly to follow our progress, or visit www.quay2c.com to find out more about us and our work.

Showing posts with label Back courtyard to garden stairs. Show all posts
Showing posts with label Back courtyard to garden stairs. Show all posts

Tuesday, 23 September 2014

Elevated view of the houses with the green roof installed post the 200 visitors thro' the doors for London Open House on Saturday ( so busy forgot to take any pics)
The show house with walkway in and Laundry houses signage panel

Mima and the team have planted out the raised boxes the rear 
Back planters courtyards etc all now complete

Side elevation and replacement planting to next doors garden now complete.

Our friend furniture maker David Gates installed some of his "Rhetorical Objects" for Open House day which look great in the house . http://www.davidgatesstudioworkshop.co.uk/#/gallery3/

The oak treads now on the staircase

The Ground floor wet room with slate floors

Basement main bathroom


the entry walkways balustrading now in



Laundry houses signage panel close up

Entrance to the show house

The staircase with exposed timber walls and a "Rhetorical Object" by David Gates

Julia sitting in the Kitchen / Dining with nice late afternoon sun.


Friday, 5 September 2014

Front door in to no 21..........hooray !!

Grating in to front balcony

Grating balcony seen from basement
Dave's kitchen in with oak worktops

Planters and steps in to the back garden with Michael finishing the balustrading

Semi basement courtyard clad in larch and camaru as seen from garden

Metal walkways to front in with initial balustrading panel between the houses

Michael & Chris getting the front door straight !


Wednesday, 13 August 2014

Ground floor bathroom mosaic now grouted with rooflight above

Ground floor mosaic and slate floored wet room to bathroom

The WHB to the en suite bathroom in Twyfords David Chipperfield designed range
The heated towel rail to the main basement level bathroom
The shower fittings now in to the main bathroom.
Decking steps from basement to garden now taking shape

The back steps decking and plant boxes

The Nell brothers celebrate the arrival of Davids new born daughter in true South African style.........or is it just a dad dance ! 

Seb laying our oak flooring with his usual TLC




Wednesday, 4 June 2014


Local Architects Niki & Liz of SE5 Architects give the top room a smile of approval !
The underfloor heating being laid in the top room

Painted plaster in stair well

Electrics in

Oak flooring now on site

The planters are taking shape

Thursday, 10 October 2013

The back is further revealed. The blue tanks are the foul and rainwater for each house which will be brought to the front and put under each of the lightwells with a pumping system. 

Local Architect friend Niki Borrowiecki of Se5 Architects and the inspiration for the blog http://springhill-se5.blogspot.co.uk/makes an after hours visit to site and inspects our ducts! His new houses in Camberwell have just come on the market http://www.themodernhouse.net/sales-list/paddock-house-grove-park-london-se5/description-817/

Wednesday, 18 September 2013

On Monday Photographer Anthony Coleman came to site and took these pictures of progress. All is looking good to have the basement complete to receive the solid timber super structure in October

Back view with stairs to garden in place

General site view

General site view

Thursday, 12 September 2013

Stairs in place from the bedroom courtyard up to the back garden. These will have recycled plastic decking on them with raised planter beds to the side.

Precast stair being lifted into position at the back of the site

the precast concrete stairs for the entry up to the garden at the back being delivered.