Please comment back to studio@quay2c.com

Welcome to our blog documenting the construction of two new houses in Asylum Road, Peckham. The design of the scheme can be seen on our website.

These have been named the Laundry Houses. During the design phases of the project, we found that there had been a laundry on the site of Albert Way, the road that the new houses will open onto. The laundry theme has informed the material and design decisions we have been making.

Over the coming months we will be posting photographs of the construction process and images of things that have influenced and informed the design.

Come back regularly to follow our progress, or visit www.quay2c.com to find out more about us and our work.

Showing posts with label Concrete pour. Show all posts
Showing posts with label Concrete pour. Show all posts

Thursday, 26 September 2013

The completed wall to no 18 Asylum Rd side


Chris and Seb prepare for the last bit of basement wall to be cast

Friday, 2 August 2013

The site getting prepared for a significant area of ground floor slab being poured. 

Friday, 12 July 2013

One off Basements Team inspecting the concrete pour and vertical pre cast panels.

Pre cast vertical panels being secured by in situ cast concrete slab floor.

Pre cast panels now on site

Thursday, 6 June 2013

The back light wells and the inside of the back bedrooms slab in place awaiting a pour of concrete to join the two walls up and to be extended on each side. 

Friday, 31 May 2013

A pic from Chris on site today......the trench box has moved revealing our new walls.....it all happens in a day!!!

Thursday, 30 May 2013

Back lightwell to the north house. The extra upstand denotes where the solid timber external above ground walls will sit.

Both lightwells seen from the side still with the trench boxes which are about to be taken out and repositioned for the next pour & precast units.

Shuttering off the back lightwell walls poured in situ as seen from the new back gardens to the houses.