Welcome to our blog documenting the construction of two new houses in Asylum Road, Peckham. The design of the scheme can be seen on our website.

These have been named the Laundry Houses. During the design phases of the project, we found that there had been a laundry on the site of Albert Way, the road that the new houses will open onto. The laundry theme has informed the material and design decisions we have been making.

Over the coming months we will be posting photographs of the construction process and images of things that have influenced and informed the design.

Come back regularly to follow our progress, or visit www.quay2c.com to find out more about us and our work.

Showing posts with label Plumbing. Show all posts
Showing posts with label Plumbing. Show all posts

Friday, 2 May 2014


Camaru cladding boards fixed down no 18 AR side
 Camaru cladding boards fixed down no 14 AR side
Plastering starting in the kitchen and lots of light coming in the rooflights in the lobby behind. 

A 2m2 sample of the oak engineered timber floor boards to be used throughout both houses
The utility room "kit" is appearing

The basement bathrooms are progressing

All the rooflights are now in and working wonders even in the rain 



Friday, 7 February 2014

Our new front doors from the inside (currently stored on the floor and rotated in the pic)
View from the first floor window


Studwork walls are now in, this one defining the ground floor lounge looking thro' the lobby and Kitchen / Dining towards the street.

Steve the plumber has started ! A boiler is in and some nice neat pipework. 

Chris has started pulling some wires, so electrics are on their way