Please comment back to studio@quay2c.com

Welcome to our blog documenting the construction of two new houses in Asylum Road, Peckham. The design of the scheme can be seen on our website.

These have been named the Laundry Houses. During the design phases of the project, we found that there had been a laundry on the site of Albert Way, the road that the new houses will open onto. The laundry theme has informed the material and design decisions we have been making.

Over the coming months we will be posting photographs of the construction process and images of things that have influenced and informed the design.

Come back regularly to follow our progress, or visit www.quay2c.com to find out more about us and our work.

Showing posts with label Electrics. Show all posts
Showing posts with label Electrics. Show all posts

Friday, 7 March 2014

View from the front with the service rooms at basement level in the left foreground.
the meter room and the bike shed floor. Gas in this week electrics next !

The "new" reused stocks wall to no 14 Asylum Rds Garden
Terry working away on the wall this week


Our one new garden cleared for preparation of the lawn and landscaping

Still liking the afternoon light to the front of the houses

Afternoon light through the open front door to No 22

House no 21 now has pretty much all the first fix electrics in and is plasterboarded

The lounge of no 21 happily now plasterboarded


Friday, 7 February 2014

Our new front doors from the inside (currently stored on the floor and rotated in the pic)
View from the first floor window


Studwork walls are now in, this one defining the ground floor lounge looking thro' the lobby and Kitchen / Dining towards the street.

Steve the plumber has started ! A boiler is in and some nice neat pipework. 

Chris has started pulling some wires, so electrics are on their way