Please comment back to studio@quay2c.com

Welcome to our blog documenting the construction of two new houses in Asylum Road, Peckham. The design of the scheme can be seen on our website.

These have been named the Laundry Houses. During the design phases of the project, we found that there had been a laundry on the site of Albert Way, the road that the new houses will open onto. The laundry theme has informed the material and design decisions we have been making.

Over the coming months we will be posting photographs of the construction process and images of things that have influenced and informed the design.

Come back regularly to follow our progress, or visit www.quay2c.com to find out more about us and our work.

Tuesday, 28 January 2014

Example of camaru timber cladding now on order that sits above the brickwork garden walls

Brickwork garden wall to no 18 Asylum Rd side.

Brickwork garden wall to no 18 Asylum Rd now nearing completion.

Studwork walls are now being constructed in the basement defining the rooms

Back bedroom to the garden. The concrete walls outside will be clad in vertical rough sawn boards stained white to reflect more light back into the room. 
The main downstairs bathroom.

View from the front bedroom with the utility room and ensuite bathroom beginning to take shape.

Marcin casting the floor for the bike sheds and demarcation chambers as we move towards getting the services in.

Friday, 10 January 2014

The front elevation now with roof on, insulation & tyvek waterproofing membrane on top 

The back elevation now with roof on, insulation & tyvek waterproofing membrane on top


Stairs are now in to get to the screeded basement floor. This will be overclad with a final finish of oak boards as seen in the photo below.

Our vertical cross laminated timber structure will be left exposed on the spine walls between the two houses. The sample of oak flooring seen here will compliment them on all the floors and stairs 


Monday, 6 January 2014

Happy New Year to all. We got some flat roofing on the houses and the walls covered in insulation and tyvek before Xmas so we have beaten off the inclement weather pretty well. We will be posting further pictures in the coming weeks as we work towards completion in May. 

Thursday, 12 December 2013

Big day today pumping in the screeds to the basement.
The concrete coming to site being poured into the little orange pump.

The underfloor heating pipes in place before being covered in concrete screed


The one house basement completely screeded. An engineered timber floor will float on top of this after 120 days when the screed has fully dried out and the heating can be put on.

The brickwork skin appearing along the no 18 garden side of the building

Good to see our first floor pods being insulated awaiting the tyvek breather membrane waterproofing layer ready for the glass cladding.  


Friday, 6 December 2013

Thursday, 5 December 2013

The front view with windows now installed.
The view from the kitchen towards Albert Way with the sliding doors now in.

The Ground floor sliding doors now in as seen from the basement 


Mark Cousins Architect from Edinburgh Univ School of Architecture
visits site at the weekend with Julia.

The view from Albert Way last weekend
Our basement tanking gets nearer completion.
The flat roof membrane over the ground floor awaiting sedum covering in the spring.
Rooflights to the GF bathroom and lobbies temporary covered to the left.



Our underfloor heating pipe has arrived to go in the basement screed